The tool MLIS/MNIS GAO 2.2: network planning optimization 

Short description

There are two varieties of this optimizing software tool of version 2.2: "Multilingual local instrumental system of goal achievement optimization (MLIS GAO 2.2)" and "Multilingual network instrumental system of goal achievement optimization (MNIS GAO 2.2)".

Programs MLIS GAO 2.2 and MNIS GAO 2.2, created on the basis of IT AC DTIP, are designed to find optimal compromise between a cost and time of performing the network graph, that presents a given set of chains (ordinary and nested) of linked operations, aimed at achieving a set goal. Each of these operations is characterized by different options of values of cost and net time of its execution, relating to the respective individual resources, some of which may be temporarily unavailable. MLIS/MNIS allow to minimize the cost (or time) of performing the network graph at a given restriction on the time (cost) of its performance, which is achieved by finding the optimal options of executing all its operations. There is also provided a mode of realization accompaniment for the existing network graph. It follows that MLIS/MNIS possess all features for solving tasks of project management, where a plan of project creation is presented in the form of a network graph of arbitrary structure.

MLIS/MNIS GAO 2.2 are multilingual programs. Alternative languages of their interfaces are stored in separate files, called language shells. These programs include two such shells: Russian and English, as well as a special program of version 1.0 called "Генератор языковых оболочек (ГЯО 1.0) (Generator of language shells (GLS 1.0))", that allows users themselves to create such shells for any languages in which they usually communicate.

MLIS GAO 2.2 is an offline program, designed for a particular user (lite version of this program is free).

MNIS GAO 2.2 — a network program, designed to provide to provide via Internet or a local network of network services to many users. It consists of two parts: one remote module of optimization (MO), wherein occurs synthesis of optimal strategies of performing network graphs, and numerous automated work places (AWPs), that are targeted to specific users of MNIS. Each such AWP is designed to prepare by an individual user the input data of tasks to be solved and to output the results of their solution. Informational link between AWPs and MO is realized on Internet (a local network) by exchange of files with input and output data. At that, MO is located on a network server, that provides operativity and full automation of the process of interaction between AWPs and this module.

MNIS GAO 2.2 is the key tool of a new technology of project management, proposed by the founder of IT AC DTIP. For its implementation to life it is proposed to create and distribute worldwide the international outsourcing service (see below publication 4) on the development and realization accompaniment in any language of optimal plans of performing various projects in any design, construction and industrial companies and organizations.

Areas of possible use of MLIS/MNIS GAO 2.2 are design, construction, industrial production and business.

The author and creator of this software tool — M.V. Burlakov, the founder of IT AC DITP (Kiev, Ukraine). Its term of putting into operation — August 2016. Place of its development — Kiev (Ukraine).

Note. You can solve for free in MNIS GAO 2.2 up to 10 test tasks, by clicking the link. You can also buy from the founder of Technology the set of MLIS GAO 2.2 program with binding via its serial number to technical parameters of the computer on which it will be installed, for what you should go here.

More detailed information on MNIS GAO 2.2, as well as a set of the lite version of program (LVP) MLIS GAO 2.2 you can get below on this page.

List of publications

1. Бурлаков М.В. Больше не существует проблемы компромисса между стоимостью и временем достижения поставленной цели (Burlakov M.V. There no longer exists a problem of compromise between cost and time of achieving a set goal). — 15.06.2014.

2. Бурлаков М.В. Предложение сотрудничества по внедрению уникальной технологии управления проектами (Burlakov M.V. Offer of cooperation for implementation of a unique technology of project management). — 24.03.2015.

3. Бурлаков М.В. О возможности внедрения в Интернете уникальной технологии управления проектами (Burlakov M.V. On the possibility of implementation in Internet of unique technology of project management). — 24.03.2015.

4. Burlakov M.В. Creation of international outsourcing service on optimizing project management. — 03.09.2016. 

Information files

Download a document "Technical characteristics of MLIS/MNIS GAO 2.2" (file "Technical_characteristics_of_MLIS-MNIS_GAO_2.2_upc.pdf", 253 KB). 

Download a document "Press release of MLIS/MNIS GAO 2.2" (file "Press_release_of_MLIS-MNIS_GAO_2.2_upc.pdf", 68 KB).  

File of LVP MLIS set

Download a multilingual set LVP MLIS GAO 2.2 (file "LVP_MLIS_GAO_2.2.zip", 2,23 MB).